Skip to content

S.L. 601.05 · Part I · General Provisions

Regulation 78. Test reports, certification and other means of proof

Time Limits and Technical Specifications

Text of the consolidated version in force from 1 January 2024. Where this page and legislation.mt differ, legislation.mt prevails: official textThe Maltese and the English texts are both official; where they conflict, the Maltese text prevails. This page shows the English text.

(1) Contracting entities may require that economic operators provide a test report from a conformity assessment body or a certificate issued by such a body as means of proof of conformity with requirements or criteria set out in the technical specifications, the award criteria or the contract performance conditions.

(2) Where contracting entities require the submission of certificates drawn up by a specific conformity assessment body, certificates from equivalent other conformity assessment bodies shall also be accepted by the contracting entities.

(3) Contracting entities shall accept other appropriate means of proof than those referred to in sub-regulations (1) and (2), such as a technical dossier of the manufacturer where the economic operator concerned had no access to the certificates or test reports referred to in sub-regulations (1) and (2), or no possibility of obtaining them within the relevant time limits, provided that the lack of access is not attributable to the economic operator concerned and provided that the economic operator concerned thereby proves that the works, supplies or services provided by it meet the requirements or criteria set out in the technical specifications, the award criteria or the contract performance conditions.

Cross-references

Referred to by

Want your tender documents checked before publication? We will show you how Procurelex Verifika does it.

Request a demo

General information on the Public Procurement Regulations in force. Not legal advice.